Summary written by USA Jobs 24 from Amazon's advert and our data on 17,030 current US jobs. How we check every job
At a glance
Amazon is hiring a Construction Manager, Data Center Construction in Hobart, IN. It is a full-time role in Data, AI & Analytics, asking for at least 5 years of experience, first listed on November 4. The description mentions AWS and Excel. Amazon has 539 other openings in the US.
How the pay compares
Amazon has not published pay for this job, or we could not find it in the advert. Of the 1,778 data & AI jobs across the US on USA Jobs 24, 69% show pay, and the typical yearly midpoint among them is $206,000. That gives you a fair starting point when the subject comes up.
Skills in this advert
How often each skill named in this advert appears across the 1,778 data & AI jobs we list today. AWS is the most widely requested (20% of jobs), while Excel is the least common (7%). Widely requested skills are what employers expect as a baseline; rarer ones show what is special about this job.
Paste your resume and this advert into our resume match tool to see which of these words your resume already covers.
Before you apply
- Check it is still open. We found this job on Amazon's Amazon Jobs site on November 4 and checked it again November 4, 5:17 AM ET. When an employer takes a job down, we remove it at our next daily update.
- Check the location works for you. This role is based in Hobart, IN. If you would need to move, ask whether relocation help is offered.
- Match the experience. The advert asks for at least 5 years of experience. If you are a little short, a close match on the skills in the advert can still win an interview.
- Tailor your resume. Use the advert's own words, such as AWS and Excel, wherever they are true for you. Our resume guide shows how.
- Apply only through Amazon's own site. Our Apply button goes straight to Amazon's Amazon Jobs page. If anyone contacts you about this job and asks for money, gift cards or bank details, stop and check it with our scam checker. Read how to spot a fake job offer.
About hiring at Amazon
Amazon has 540 openings on USA Jobs 24 today across 36 states. Most are in software & IT (180), data & AI (84) and operations (82). The biggest locations are Seattle, WA (118), Bellevue, WA (40) and Arlington, VA (35). 1% of them are remote, 11% are open to entry-level candidates and 6% show pay. We collect Amazon's jobs every day straight from its own careers system (Amazon Jobs), never from job boards or agencies.
The employer's advert
This is Amazon's own description of the job, copied word for word from its careers site. We have not edited it.
Show the full advert from AmazonHide the advert1,026 words
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As our Data Center Construction Manager (CM), you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs.
You will:
• Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
• Own construction project management and oversight of construction related activities.
• Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
• Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
• Represent Amazon’s owner’s representative on construction sites daily, as, interacting with construction trades.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding, execution, and final hand-off to our customers. We develop innovative data centers for our Customers.
Key job responsibilities
• Be Amazon’s construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
• Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases.
• Create construction project scope and request for proposals.
• Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
• Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
• Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
• Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
• Support commissioning and integrated system testing and oversight.
• Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
• Support capital request creation.
• Analyze and report construction progress and financials.
• Record and report key construction metrics to team members and management.
• Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
• Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers.
About the team
Why AWS
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Work/Life Balance
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Inclusive Team Culture
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.
Mentorship and Career Growth
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
Basic qualifications
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and into deployment or mass production
- Experience in MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems
Preferred qualifications
- 5+ years of project management in data centers or comparable critical infrastructure experience
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams and standard operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
- Experience in project management in data centers or comparable critical infrastructure
- Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings for all domains
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, IN, Hobart - 111,300.00 - 186,100.00 USD annually
USA Jobs 24 copied this listing from Amazon's official careers site on November 4, 2026 and checked it again November 4, 5:17 AM ET. Amazon will never ask you to pay to apply or to buy equipment with a check they send you. If anyone does, it is a scam.
Something wrong with this listing? Tell us and we will look into it.